JOREX LOREX / HDPE HELIPAD & GROUND PROTECTION MATS
Portable mats.
Built around your mission.
Modular HDPE mat solutions for temporary helipad projects, access routes and ground protection. Plan your mat layout, connection system and anchorage with JOREX LOREX.
Request a quotation → Explore the system ↓
Representative product image. Mat appearance and supplied configuration depend on the selected model.
ONE MODULAR SYSTEM
From individual mats to a complete project kit.
Build your requirement around the working area, ground conditions and deployment plan. Our team can help specify HDPE mat panels, compatible connectors, anchoring accessories and installation tools as an agreed project package.
HDPE mat panels
High-density polyethylene panels form the modular surface. Select the panel size, thickness and finish to match the project specification.
Connected layout
Specify compatible two-way and four-way connectors, joining hardware and edge arrangements for your planned mat layout.
Portable deployment
Plan panel handling, transport, assembly, dismantling and storage around your team and installation location.
Site-specific anchorage
Choose anchoring components and installation methods for the actual ground, weather and operating conditions.
PRODUCT DETAILS
Specify the right mat for your site.
| Specification | Project selection |
|---|---|
| Material | High-density polyethylene (HDPE) |
| Panel dimensions & thickness | Confirm against the selected model’s current datasheet |
| Panel weight & handling | Model-specific weight, grip arrangement and handling plan |
| Connections | Compatible two-way / four-way connectors and joining hardware |
| Anchorage | U-pins, anchoring nails and wire-rope arrangements as specified |
| Surface, colour & branding | Confirm the available finish and project branding options |
| Load & operating conditions | Assess the intended aircraft or vehicle, contact loads, ground support and environment |
| Documentation | Request the applicable datasheet, installation guidance and available test documentation |
For helipad applications, final suitability depends on the aircraft, prepared ground, mat layout, anchorage and the operating site’s requirements. Ask our team for the applicable model specifications before final selection.
ACCESSORIES & DEPLOYMENT
Plan the complete installation.
Connection & anchoring kit
- Two-way and four-way connectors
- Joining rods, bolts and compatible hardware
- U-pins and anchoring nails
- Steel wire rope, turnbuckles and lashing belts where specified
Accessory types and quantities are confirmed in the project bill of quantities.
Tools & handling
- Pin-driving and nail-extraction tools
- Suitable hammers and installation tool kit
- Panel transport and storage arrangements
- Assembly and dismantling guidance
Confirm the tools included in your quotation and the resources required at site.
Deployment sequence
- Assess and prepare the ground.
- Set out the approved panel layout.
- Place and connect the panels.
- Install the specified anchorage.
- Inspect the completed surface before use.
Follow the supplied installation instructions for the selected system.
PROJECT APPLICATIONS
Tell us where you need the surface.
Temporary helipad projects
Discuss landing-area dimensions, aircraft details, site preparation and operational requirements.
Ground protection
Discuss temporary working areas, pedestrian routes and surface protection around your project.
Access & logistics areas
Share vehicle loads, ground conditions and traffic patterns for product selection.
COMMON QUESTIONS
Before you order.
What information is needed for a quotation?
Send the location, required surface dimensions, intended aircraft or vehicles, ground conditions, quantities and delivery timeline. Include your technical specification or BOQ if available.
Are connectors and anchoring tools included?
The supplied kit follows the agreed quotation and BOQ. Confirm connectors, pins, ropes, tools and spare quantities when placing your order.
How do I confirm load capacity and installation time?
Ask for the selected model’s data and installation plan. Capacity depends on the complete system and supported ground; deployment time depends on area, crew, preparation and anchorage.
Can I request technical documents for a tender?
Share the tender specification and BOQ. Our team can provide the applicable product information and confirm available supporting documentation for the proposed configuration.
LET’S PLAN YOUR PROJECT
Your site. Your layout. Your mat system.
Send your requirement for a project quotation, current datasheet and proposed accessories. Include the installation location, landing-area dimensions, intended aircraft or vehicle and delivery schedule.
